Right of Way Maintenance
One of the first initiatives by the Board of Directors for Gateway85 when it was first formed in 2006 was to take over the maintenance of the ROW shoulders within the district. This included the main corridors in the area along with the three interchange ramps along I-85 at Jimmy Carter Boulevard, Indian Trail, and Beaver Ruin Road. Gateway85 now maintains 85 miles of roadway throughout the district. The streets and ramps are mowed, trimmed and cleaned once every two weeks to maintain a consistent curb appeal in the area.